Toilet renovation: where to Begin

The bathroom is an area with particular terms: high humidity, temperature differences. That is why making repairs in the restroom, you need to clearly plan the entire working process, to think about the sequence of steps to be performed. In the following article, you will discover where to begin the repair in the bathroom and what types of work should be carried out with your hands. Step-by-step instructions for bathroom repair

Phase 1: drawing up a plan and deciding on a layout solution.

Repair in the bathroom can be of two types:

  • Unplanned, spontaneous, originating from the will of unforeseen circumstances. By way of example, in case of a pipe burst, flooding with neighbors.
  • Planned, that is either capital or cosmetic. It requires planning, serious monetary investment and time.

Begin repairs at the toilet is to determine the design, inside. Think through to the last detail, what’s going to be the space, choose a color. Pastel colours are conventional, as well as a mixture of blue and blue, black or peach with beige.

Begin repairs at the toilet is to ascertain the design, interior layout. Consider detail, what’s going to be the room, select a color. Pastel colours are thought to be traditional, as well as a combination of colours.

The next point is that the choice of facing substance. Generally, finishing in the toilet is done with tile, porcelain tiles, mosaicand vinyl panels. Examine the plumbing, whether it has to be replaced. If needed, pick an appropriate choice. Proceed to the measuring function: measure all sides, figure out the area of the room. Based on these information, we indicate the location of these plumbing fixtures.

Measure 2: the choice of sanitary fittings and material for completing.

It vsyakuhnya.ru is crucial to recognize that the purchase of sanitary ware precedes the planning stage, rather than vice versa. This means that first we develop a new design project, create a plan, then go to the store. The following point – you need to specify how big your favourite plumbing fixtures and inspect the plan, whether it fits.

It’s crucial to realize that the purchase of plumbing fittings is preceded by a preparation period, and not vice versa. This means that first we create a new design project, make a plan, and then go to the store. Another one

In terms of materials for completing, it’s preferable to get them instantly for the whole repair cycle, and that you will not be diverted if something has been missing. Remember about preparing the necessary tools.

Measure 3: dismantling tiling and plumbing.

Once All of the preliminary work has been completed, move on to the Start of the task process:

  • Remove the sink and tub from the area, even if they won’t be replaced with fresh ones. In this way, you are able to keep them intact and clean.
  • Remove the old tile, cleaning following it all of surfaces: ceiling, walls, floor.
  • Remove old paint from the walls, if they were previously painted, as the glue solution or a fresh layer of paint will not stick to the surface.

Step 4: Cost of communications: pipes, electric wiring.

Quite frequently in an old house, you should carefully inspect and replace not only the pipes which are in the bathroom itself, but in addition the principal riser, and sometimes the interfloor pipes. Why is it worth doing so? Old pipes anytime may give a flow, then the new fix is going to be spoiled, it is going to require extra investment to get rid of flaws.